Multi-CAD workplace
Multi-CAD workplace
How many of you work in multi-cad situations?
How do you deal with it? Do you maintain the old software, translate everything, rebuild everything, hire out help when you have to use the other system... How do you do it?
I'm wondering how you maintain the additional tools, how you maintain the additional data. Do you translate, rebuild, contract out, etc....?
Plus, if you want to explain how you came to the situation with more than one CAD tool, I'd like to hear that story as well.
How do you deal with it? Do you maintain the old software, translate everything, rebuild everything, hire out help when you have to use the other system... How do you do it?
I'm wondering how you maintain the additional tools, how you maintain the additional data. Do you translate, rebuild, contract out, etc....?
Plus, if you want to explain how you came to the situation with more than one CAD tool, I'd like to hear that story as well.
Blog: http://dezignstuff.com
Re: Multi-CAD workplace
Where I'm at now it's essentially SW and Draftsight. I consider those to be different CAD systems.
We have to maintain everything the same way you would if we only used one system.
I've worked a couple of places in the past where multiple systems where used. This happens a lot for Tier1-3 automotive suppliers because they are expected to work in the native system of the customer. We typically maintained 3-4+ different systems.
In those cases the tools were all maintained in the same way. We had VAR's, licenses etc etc in the same manner you would for one system. All the settings, templates etc were maintained similarly as well.
For the most part we never translated back into native at the customer level. For instance if we were working on a GM seat track we would translate out but never back in. The customers native files were always maintained and any work done to them was done on those native files. We would often translate out into the other "In house systems" that were used for stamping, gaging, fixturing etc.
We would occasionally transfer into "In house" systems. So for instance most of the contractors working there or outside vendors used AutoCAD. Most of the in house employees used Unigraphics, which also happened to be what GM used. So once "Accepted", built and delivered the drawings that were done by contractors and vendors were translated into Unigraphics.
Typically the files naturally fell into separate categories that most of the time closely lined up with departments. So die drawings where drawn in some system but for the most part all the dies where drawn in or translated into that system. At the same time they were stored all in the same place and not typically with "Customer parts" or other departments so a relatively natural "Segregation of CAD systems" seemed to occur.
We have to maintain everything the same way you would if we only used one system.
I've worked a couple of places in the past where multiple systems where used. This happens a lot for Tier1-3 automotive suppliers because they are expected to work in the native system of the customer. We typically maintained 3-4+ different systems.
In those cases the tools were all maintained in the same way. We had VAR's, licenses etc etc in the same manner you would for one system. All the settings, templates etc were maintained similarly as well.
For the most part we never translated back into native at the customer level. For instance if we were working on a GM seat track we would translate out but never back in. The customers native files were always maintained and any work done to them was done on those native files. We would often translate out into the other "In house systems" that were used for stamping, gaging, fixturing etc.
We would occasionally transfer into "In house" systems. So for instance most of the contractors working there or outside vendors used AutoCAD. Most of the in house employees used Unigraphics, which also happened to be what GM used. So once "Accepted", built and delivered the drawings that were done by contractors and vendors were translated into Unigraphics.
Typically the files naturally fell into separate categories that most of the time closely lined up with departments. So die drawings where drawn in some system but for the most part all the dies where drawn in or translated into that system. At the same time they were stored all in the same place and not typically with "Customer parts" or other departments so a relatively natural "Segregation of CAD systems" seemed to occur.
- Glenn Schroeder
- Posts: 1527
- Joined: Mon Mar 08, 2021 11:43 am
- Location: southeast Texas
- x 1777
- x 2142
Re: Multi-CAD workplace
Just one here. We transitioned from AutoCAD about the time I started coming over from the construction department, in 2009. We kept some AutoCAD licenses for quite a while to handle old drawings, but let them go. I think one of two of the engineers might still have a personal license, but I haven't needed to open a .dwg in years.
"On the days when I keep my gratitude higher than my expectations, well, I have really good days."
Ray Wylie Hubbard in his song "Mother Blues"
Ray Wylie Hubbard in his song "Mother Blues"
- AlexLachance
- Posts: 2226
- Joined: Thu Mar 11, 2021 8:14 am
- Location: Quebec
- x 2419
- x 2061
Re: Multi-CAD workplace
We use SolidWorks, and have AutoCAD 2000 running on VMWares for our old drawings. One of the guy that works with sales also uses it on a regular basis simply to make quick approval drawings. I took care of the transition from AutoCAD 2000 to SolidWorks in 2012 a year after joining the company.
Re: Multi-CAD workplace
Not well. Usually with snarky sarcasm and frank remarks.
We are continuously failing at all of it. In fact, it looks a lot like this:
Most of the additional tools is add-ins to save pdf or dxf.
In PDM, and it's a bit of a mess. Getting all the SE files remodeled in SW, one bad example is users will let the new SW file be saved as a serial number instead of matching the filename to the existing SE files for that part.
We tried translation, 99% failure, in the process of remodeling them all, which is breaking mates in all of the where used.
Considering contracting out but it's costly and we are struggling to get a plan of how to keep their work integrated with all the other file relations in our PDM dataset.
We were clueless how much it would cost and how long it would take to get our existing Solid Edge data set modeled in Solidworks so we can use Solidworks for new products. Eventually SE will be out, but it's going to be a while yet. Heck, for all I know DSS will drop SW Desktop in favor of the Platform and we'll go back to SE.
- mike miller
- Posts: 878
- Joined: Fri Mar 12, 2021 3:38 pm
- Location: Michigan
- x 1070
- x 1231
- Contact:
Re: Multi-CAD workplace
@bnemec, at least your day isn't going as badly as this guy's.
- Attachments
-
- The Bricklayer's Song.mp3
- (3.47 MiB) Downloaded 248 times
He that finds his life will lose it, and he who loses his life for [Christ's] sake will find it. Matt. 10:39
Re: Multi-CAD workplace
Sounds like you need some help. Geez. Stuff shouldn't go that badly for anyone.bnemec wrote: ↑Thu Sep 09, 2021 3:33 pm Not well. Usually with snarky sarcasm and frank remarks.
In PDM, and it's a bit of a mess. Getting all the SE files remodeled in SW, one bad example is users will let the new SW file be saved as a serial number instead of matching the filename to the existing SE files for that part.
Dude, I don't know how to tell you this, but don't let go of the rope (listen to @mike miller 's song)....We were clueless how much it would cost and how long it would take to get our existing Solid Edge data set modeled in Solidworks so we can use Solidworks for new products. Eventually SE will be out, but it's going to be a while yet. Heck, for all I know DSS will drop SW Desktop in favor of the Platform and we'll go back to SE.
Blog: http://dezignstuff.com
Re: Multi-CAD workplace
We (I) did not understand what we were getting into. So it's been a learning process.
Right!
I think meeting the barrel on my way down would be like switching back to Solid Edge now. Get it going one way then get it again going back the other.
Re: Multi-CAD workplace
We use two here on a regular basis, the primary being SW and the second is KeyCreator. Three if you count Mastercam but that's mainly the guys in the shop. We were all CadKey (now KeyCreator) when I started, then transitioned over to SW. We keep two seats of KeyCreator active, we have 6 or 7 seats of SW. No plans to ever switch the CadKey\KeyCreator legacy stuff to SW, those files go back to the mid 1990's.
Re: Multi-CAD workplace
Currently our CAM is a bigger mess than our CAD. We program in CAMWorks, some bastardized program that we use on the Mazaks only, by hand in Text only and conversation/GCode at the machines in some cases. On top of that we verify some of our programs in Vericut.bradb wrote: ↑Fri Sep 10, 2021 7:20 am We use two here on a regular basis, the primary being SW and the second is KeyCreator. Three if you count Mastercam but that's mainly the guys in the shop. We were all CadKey (now KeyCreator) when I started, then transitioned over to SW. We keep two seats of KeyCreator active, we have 6 or 7 seats of SW. No plans to ever switch the CadKey\KeyCreator legacy stuff to SW, those files go back to the mid 1990's.
To make matters worse there is absolutely ZERO organization to where the programs are, how they are controlled etc. We have the same program that is different on different machines, some programs are on individuals desktops and we have programs in probably 3-4 different network locations.
The whole situation is a cluster of epic proportions and a daily disaster in the making.
-
- Posts: 423
- Joined: Tue Mar 09, 2021 10:11 am
- x 439
- x 233
Re: Multi-CAD workplace
Our lead designer uses Rhino
Electrical uses 2D AutoCad
There are still some other parts in AutoCad
Rest is SolidWorks
The plan was to move everything over to SolidWorks by 2017 - but some priorities just left some AutoCad drawings. We are moving closer to the point where we don't use AutoCad anymore. Electrical was supposed to move to 3D with SolidWorks 2017 but some very important features were only implemented 2020 and 2021. So the plan is to get rid of AutoCad when we switch to 2021 and get everything done in 3D.
Rhino is only used by our lead designer to rapidly do some mock ups - we convert them to SolidWorks later.
Electrical uses 2D AutoCad
There are still some other parts in AutoCad
Rest is SolidWorks
The plan was to move everything over to SolidWorks by 2017 - but some priorities just left some AutoCad drawings. We are moving closer to the point where we don't use AutoCad anymore. Electrical was supposed to move to 3D with SolidWorks 2017 but some very important features were only implemented 2020 and 2021. So the plan is to get rid of AutoCad when we switch to 2021 and get everything done in 3D.
Rhino is only used by our lead designer to rapidly do some mock ups - we convert them to SolidWorks later.
Re: Multi-CAD workplace
A bit different for us (Surfaceink), as we are a service firm with many different clients with different platforms. Must of us are adept at more than one.
Mostly NX, SW, and Creo. We haven't had to consider Inventor or OnShape at this point.
Mostly NX, SW, and Creo. We haven't had to consider Inventor or OnShape at this point.
- jayar
- Posts: 121
- Joined: Tue Mar 09, 2021 1:50 am
- Location: The Magic Kingdom (for now)
- x 241
- x 174
- Contact:
Re: Multi-CAD workplace
One engineer here uses Catia (an old version), some "engineers", and I use the term very loosely, use SWX 2013, and I, I like to think of myself as a real engineer, use SWX 2021.
Re: Multi-CAD workplace
I don't understand the connection between being a "real" engineer and SolidWorks, let alone any specific version. If you're defining your level of professional achievement by CAD platform usership, you're basically a technician.
- mattpeneguy
- Posts: 1386
- Joined: Tue Mar 09, 2021 11:14 am
- x 2489
- x 1899
Re: Multi-CAD workplace
A "real" engineer would use a real tool, like:
- jayar
- Posts: 121
- Joined: Tue Mar 09, 2021 1:50 am
- Location: The Magic Kingdom (for now)
- x 241
- x 174
- Contact:
Re: Multi-CAD workplace
Well, if you saw what passes for an 'engineer' here in this place you would understand what I meant. The question was what s/w is used, it is not the means to being an engineer.
Re: Multi-CAD workplace
Our mechanical dept standard set is Draftsight and Solidworks but I think there is couple of AutoCAD licenses too. Automation and analysis departments use other software.
Sincerely,
JuTu
__________________
Lentäjä on ulkona ja lukossa.
JuTu
__________________
Lentäjä on ulkona ja lukossa.
- VicFrauenfeld
- Posts: 87
- Joined: Fri Mar 12, 2021 9:27 am
- Location: Cleveland, Wisconsin USA
- x 83
- x 81
Re: Multi-CAD workplace
Company policy is that everything new is done in SolidWorks. We have two licenses of Creo to be able to view and "simple tweak" old legace Pro-E files. We also have a few DXF files that we converted from an even older 2D system (ExpertCAD).
We normally do not manipulate the old data. If anything major needs to change on it, we convert it to SolidWorks at that time.
This seems to work well for us.
We normally do not manipulate the old data. If anything major needs to change on it, we convert it to SolidWorks at that time.
This seems to work well for us.
Be quick to listen, slow to speak and slow to become angry.
-
- Posts: 197
- Joined: Wed Apr 14, 2021 11:18 pm
- x 111
- x 160
Re: Multi-CAD workplace
One place I worked at back in the 90s had 9 different CAD software in the design office!
You may be thinking then 'Oh there must of been a lot of people working in that office'. Only 10 people.............
CADDS
Catia
Delcam
Unigraphics
I-DEAS
Vero (first year release)
Another 3D software - can't remember it's name
AutoCad
Cheap 2D can't remember it's name
You may be thinking then 'Oh there must of been a lot of people working in that office'. Only 10 people.............
CADDS
Catia
Delcam
Unigraphics
I-DEAS
Vero (first year release)
Another 3D software - can't remember it's name
AutoCad
Cheap 2D can't remember it's name
Re: Multi-CAD workplace
This should really be a huge red flag that you are going in the wrong direction from SE to SW! And to be honest this appears, on the surface, to be a process issue to some degree.bnemec wrote: ↑Thu Sep 09, 2021 3:33 pm
In PDM, and it's a bit of a mess. Getting all the SE files remodeled in SW, one bad example is users will let the new SW file be saved as a serial number instead of matching the filename to the existing SE files for that part.
We tried translation, 99% failure, in the process of remodeling them all, which is breaking mates in all of the where used.
Considering contracting out but it's costly and we are struggling to get a plan of how to keep their work integrated with all the other file relations in our PDM dataset.
We were clueless how much it would cost and how long it would take to get our existing Solid Edge data set modeled in Solidworks so we can use Solidworks for new products. Eventually SE will be out, but it's going to be a while yet. Heck, for all I know DSS will drop SW Desktop in favor of the Platform and we'll go back to SE.
But if you haven't heard SW and SE are both Parasolid software. So export the solid in Parasolid...then you really don't have a translation. You are just opening a source file. As for drawings well, that has never worked- at least in this direction SW to SE...now if you want to go from SW to SE that is a totally different animal..did you know that SE will open and read the SW drawing file and totally recreate the drawing file in SE? Yep! So now you can open the SW solid in SE, apply parametrics if you want and have the drawing...and about those assy contraints...yep those get pulled into SE as well! See you are just going in the wrong direction.
The funny part is that SE is actually using the SW API tools to do all the work for the drawing and assy constraint "translations"!!
- mattpeneguy
- Posts: 1386
- Joined: Tue Mar 09, 2021 11:14 am
- x 2489
- x 1899
Re: Multi-CAD workplace
Makes sense considering Seimens owns the kernel and Dassault licenses it. That's probably one of the reasons that SE has synchronous and SW doesn't, too.Ry-guy wrote: ↑Thu Dec 02, 2021 3:44 pm This should really be a huge red flag that you are going in the wrong direction from SE to SW! And to be honest this appears, on the surface, to be a process issue to some degree.
But if you haven't heard SW and SE are both Parasolid software. So export the solid in Parasolid...then you really don't have a translation. You are just opening a source file. As for drawings well, that has never worked- at least in this direction SW to SE...now if you want to go from SW to SE that is a totally different animal..did you know that SE will open and read the SW drawing file and totally recreate the drawing file in SE? Yep! So now you can open the SW solid in SE, apply parametrics if you want and have the drawing...and about those assy contraints...yep those get pulled into SE as well! See you are just going in the wrong direction.
The funny part is that SE is actually using the SW API tools to do all the work for the drawing and assy constraint "translations"!!
Re: Multi-CAD workplace
Yeah, hind sight 20/20. The hook was pretty well set by the time things became obvious. There's definitely process issues, main two are we didn't know what process to use in the new system and users were/are so change saturated that they didn't get all the new processes that we tried to lay out.
Re: Multi-CAD workplace
Over the past 3 years I have been slowly transitioning from Solidworks for everything to AutoCad for all submittals and Solidworks for piece details & fabrication drawings.